Celero Infrastructure is proposing to develop the Winton Renewable Energy Stability and Storage Terminal (WRESST) located adjacent to the existing Glenrowan Terminal Station in Winton, Victoria.
The Project is currently in development, and we are seeking feedback from neighbours and the wider community.
WRESST (otherwise known as a Battery Energy Storage System or BESS) is proposed near the existing Winton and Glenrowan West Solar Farms.
Strategically located adjacent to the Glenrowan Terminal Station, the Project will strengthen grid reliability in the region while minimising the need for additional transmission infrastructure.
The site comprises cleared land and proximity to the Hume Freeway, minimising environmental and construction impacts.
WRESST is proposed to have a capacity of up to 400 MW / 1600 MWh, providing approximately 4 hours of energy storage.
The project will store energy from the grid, including energy being generated locally, and deliver it to Victorian homes and businesses when it is needed most. It will reduce the cost of power and increase the reliability and stability of the electricity grid.
Location: Glenrowan, Victoria
Storage capacity: 400 MW / 1600 MWh
Storage duration: 4 hours
Status: Development
Connection: Underground to the Glenrowan Terminal Station
We will engage the CFA early in the design process, and will continue to work with representatives throughout the project lifecycle.
We understand that community members may have questions about the safety of battery storage technology, including fire risk. We take these concerns seriously and want to address them directly.
WRESST will be designed in accordance with the CFA Design Guidelines and Model Requirements for Renewable Energy Facilities, including required fire breaks, water tanks, access routes for emergency vehicles, and setbacks.
We are engaging – before any formal planning permit application is lodged – because we believe communities need to be informed and involved from the beginning.
We will contact near neighbours directly and individually. If you live close to the site and would like to meet with us, please get in touch.
We will continue to host events throughout the planning permit process to provide opportunities to meet the project team, have questions answered or provide feedback.
Cogency Australia has been engaged to lead the planning and engagement for the Project and can be contacted via phone: 0452 593 428 or email: consultation@cogencyaustralia.com.au.
EVENT DETAILS
Community Drop-In Session
Please come along to learn more about the project and speak to the team.
Date: Monday, 27 April 2026
Time: 2:30 pm - 6:30 pm
Venue: Glenrowan Recreation Reserve Hall, 5 Daniel Lane, Glenrowan
Files coming soon.
We are committed to delivering real, lasting benefits for the Winton and Glenrowan communities across the life of the project.
The Project will create lasting value to the local community by stimulating economic activity, supporting local businesses, and generating employment opportunities.
WRESST will generate approximately 100-150 jobs during construction and 4-6 ongoing operational roles. We are committed to prioritising local and regional businesses and contractors in our procurement process, where possible.
We recognise that a number of community benefit programs already exist in this area through neighbouring projects. Our program will be designed to complement, not duplicate, existing initiatives and we welcome any feedback or ideas from the community on how best to share benefits of the Project.
As part of the proposal, we are undertaking a voluntary social impact assessment (SIA) to better understand how the project may affect the local community.
This includes looking at potential impacts on lifestyle, local services, the economy and community wellbeing, as well as identifying opportunities to deliver positive outcomes.
Community input is an important part of this process. We will be undertaking a short survey soon, to gather your views. Your feedback will help inform the assessment and guide how the project is designed and delivered.
The WRESST will be a battery energy storage system (BESS) and will store energy when there is excess energy supply in the grid, discharging during times of high demand.
Celero Infrastructure.
Planning and early development.
We are currently engaging with near neighbours and the surrounding community, and will be hosting a Community Drop-In Session on the 27th of April 2026, at the Glenrowan Recreation Reserve Hall.
Any submissions made will be considered by the Department of Transport and Planning when they assess the Planning Permit Application. You are able to make a formal submission when the Application is on public exhibition, however, we invite feedback on the design and layout of the WRESST at any stage. Please feel free to reach out via the contact form below, or in-person at our Community Drop-In Session.
A Planning Permit Application has not been submitted as yet. As such, no decision on the outcome of the permit has been made.
At this early stage, reach out and help grow our understanding of the region and how the WRESST could improve prosperity for locals.